Organic Keywords: What Are They & How to Find Them

10 min read
August 30, 2024

What Are Organic Keywords?

Organic keywords are keywords used in search engine optimization (SEO) to attract free traffic.

They differ from pay-per-click (PPC) keywords, which are terms that advertisers bid on to show their ads in search results.

If you optimize your website for organic keywords, you can rank in the search engine results pages (SERPs) and get free traffic and conversions.

In this article, we’ll show you how to find organic keywords and use them to improve your search engine rankings.

Let’s start.

How to Find Organic Keywords

There are many ways to find organic keywords that can help increase your website's visibility and attract valuable traffic. 

In this section, we'll dive into several methods for finding organic keywords, including keyword research tools, analyzing competitor strategies, and utilizing free tools like Google Search Console. 

Use a Keyword Research Tool

An organic keyword research tool, such as Semrush’s Keyword Magic Tool, can identify organic keywords for your website.

With an extensive keyword database containing more than 24 billion keywords, it's one of the most comprehensive tools for organic keyword research.

For example, let’s say you run an interior design business. Type “interior design” in the search bar and click “Search.”

Keyword Magic Tool with "interior design" entered and "Search" clicked

The tool will dig into its database and surface organic keyword ideas. (In this example, more than 254,000 keywords.)

Keyword Magic Tool report for the term "interior design" with "Keyword", "Volume", and "KD%" columns highlighted

The tool also provides important keyword metrics like search volume and keyword difficulty

Search volume tells you how often people search for these keywords each month, on average.

And keyword difficulty (KD%) is how difficult it is to rank for them. 

These metrics help you prioritize which keywords to target.

For example, if your website is new and doesn't have a ton of backlinks, you can target keywords with lower keyword difficulty. So you have a better chance of ranking.

In addition to the Keyword Magic Tool, Semrush features the Keyword Overview tool for a more in-depth analysis of individual keywords. 

You can also explore related keywords and questions your audience is asking. And even see examples of ads related to the keyword. Using both of these tools gives you a good idea of which organic keywords are worth targeting for your website.

Check Your Competitors' Organic Keywords

Your competitors are probably already using organic keywords for their SEO strategy.

With their keyword data, you’ll save time and effort that would otherwise be spent conducting keyword research from scratch.

Then, target the same keywords with your website. 

Use Semrush’s Organic Rankings tool to uncover your competitors' organic keywords.

Open the tool, enter your competitor’s domain, and click “Search.”

organic rankings report

Then, navigate to the “Top Keywords” section and click “View all # keywords.”

"Top Keywords" report on "Organic Rankings" showing a list of keywords with their position, volume, traffic %, etc.

You’ll see organic keywords your competitors are ranking for.

To easily monitor your competitors’ organic keyword rankings for potential opportunities, navigate to the “Position Changes” tab in the Organic Search tool. 

"Organic Rankings" overview with the "Position Changes" tab on top highlighted

First, you will see a widget to the right labeled “Top Page Changes.” 

This widget gives you quick access to the pages on a competitor’s site that have seen the most estimated traffic change over a period of time. 

You can also click on the filter icon next to each URL in this widget to be taken to the “All Positions” report. This report is a deep dive into the keywords your competitors are ranking for. 

"Position Changes" report on "Organic Rankings" with the filter icon next to a URL on the "Top Page Changes" widget clicked

If you’re in a hurry to compile your reporting, there are preset filters that make it easy to zoom in on your desired metrics.

preset filter options on "Position Changes" including "All Changes", "Improved", "Declined", and "Changes on SERP"

The screenshot below shows several ranking metrics, including how these ranking changes affected traffic for all website keywords and URLs. 

"All Position Changes" report with the ranking changes and traffic difference columns highlighted

You can even see if your competitor’s keywords earned them a SERP feature. Or if they lost one.

This report checks for changes across 50 different types of SERP features, including in AI Overviews

You can see the keywords that are ranking for AI Overviews in the “Postions” tab. By clicking on “SERP Features” > “SERP Feature on SERP” > “AI Overview.”

AD_4nXfJLWSHsA2vRHrKcbCYKso3Uvst6FRp-5_9a0k4YQ2M85wLG8RmKsYkIrHMKYzUwe3XNUysadhml65XTwvldYY6jSImdZY2-aUpKNRiNXRtvXD0Th2YC10mkPwmHt_bTZglKYfETFsCwxcHHTdkPKhGlQNN?key=OkXEB0-06GEvd2Ga-qzyWw

You can use this information to capitalize on organic traffic opportunities. If a competitor is slipping in the rankings for a specific keyword, that might be your chance to write compelling organic content that beats theirs in the SERPs. 

Or, if you notice your competitor has begun appearing in search results for new keywords, those may be keywords to add to your strategy. 

You can also export this report by choosing your customized date range and clicking “Export.” This will send the report to an Excel spreadsheet, CSV, or CSV Semicolon. 

"All Position Changes" report with the date range filter highlighted and the "Export" button clicked

Although you can target the same keywords as your competitors, creating unique, quality content is crucial. To set yourself apart from your competitors.

Identify Keywords You Are Missing

A key aspect of SEO involves identifying and targeting keywords that your competitors are ranking for, but you aren't. 

This is where Semrush's Keyword Gap tool becomes invaluable.

Here’s how it works:

Start by identifying your main competitors in the online space. These are the websites targeting the same audience and keywords as you.

For instance, if you're optimizing a health information website like WebMD, you might enter "webmd.com" and the domains of competing health information websites.

After identifying your competitors, enter your website's domain and up to four of your top competitors into the Keyword Gap tool.

"Keyword Gap" tool start with five competing domains entered and "Compare" clicked

The tool generates a Venn diagram illustrating the keyword overlap among the analyzed websites. This visual representation gives you a quick overview of the competitive landscape and highlights areas where you might be missing out.

"Keyword Overlap" showing a venn diagram illustrating the keyword overlap among five competing websites

But the keyword table below this section is where you'll find the most valuable insights. 

Click on the "Missing" tab to reveal keywords your competitors successfully rank for, but your website isn't ranking for. 

These are prime opportunities to create new content or optimize existing pages to target these keywords.

"Missing keywords" report showing keywords competitors rank for along with metrics like volume, difficulty, etc.

Each keyword in the table comes with essential metrics:

  • Intent: The type of search intent behind each keyword (e.g., informational, transactional, navigational, commercial)
  • Position: The highest position any of your competitors holds for each keyword
  • Search volume: The estimated number of monthly searches for each keyword
  • Keyword Difficulty (KD%): An estimate of how difficult it is to rank for each keyword, with lower percentages indicating easier SEO ranking potential
metrics on the "Missing keywords" report like "Intent", "Volume", "Keyword Difficulty", and competitor positions highlighted

You will also see boxes highlighted in green. These green boxes show the highest position in comparison. For example, mayoclinic.org ranks 8 for the keyword "calorie deficit calculator," while clevelandclinic.org ranks 36. 

highest positions for each keyword on the "Missing keywords" report highlighted in green

Not all "missing" keywords are created equal. Use the tool's filters to refine your list based on factors like:

  • Filter by keyword: Include or exclude specific words or phrases to narrow your list. For example, if you're optimizing WebMD, you might filter by the word "exercise" to focus on relevant keywords.
  • Position: Start by filtering for keywords where your competitors rank highly (e.g., in the top 10 positions). These keywords have the proven potential to drive organic traffic.
  • Search volume: Focus on keywords with a significant search volume. These indicate a higher demand and potential for traffic to your site if you rank for them.
  • Keyword Difficulty (KD%): Prioritize keywords with lower KD% scores. This indicates that it may be easier for your website to rank for them than keywords with higher difficulty.
  • Intent: Consider the search intent behind the keyword. Does it align with your content type and goals? For example, if you're a health information website, prioritize keywords with informational intent (e.g., "best snacks for weight loss") rather than transactional intent (e.g., "buy snacks for weight loss").
filtering options on "Keyword Gap" including by keyword, position, volume, keyword difficulty, and intent

Since WebMD is a health information website, let’s type “exercise” into the “Filter by keyword” field and select “Easy” from the “KD” drop-down.

"exercise" entered as the keyword, the "KD" drop-down opened and "Easy" selected from the list

Now, we’ll have a list of keywords relevant to WebMD’s website, which could be easy to rank if we create quality content.

a list of keywords that include a specific term and have low competition on the "Keyword Gap" tool

By strategically filtering, you can pinpoint valuable keyword opportunities. And drive targeted organic traffic to your website.

Use Organic Traffic Insights

Semrush’s Organic Traffic Insights tool shows organic keywords you currently rank for on Google.

Use this tool to identify organic keywords for which your website ranks outside of the top 10 search results.

Because appearing outside the top 10 makes your website practically invisible to search engine users, your traffic will be limited.

A prime opportunity is to identify these keywords and optimize your website for them to improve your rankings.

To begin, set up a project in the tool.

Once complete, you will receive a detailed report.

"Organic Search Traffic" report on the Organic Traffic Insights tool showing metrics like users, sessions, engagement data, etc.

Navigate to the "Keywords" section of the report.

"Keywords" section of the "Organic Search Traffic" report

You’ll see keywords your website ranks for:

"Keywords" section showing a list of keywords a website ranks for and metrics like position, volume, difficulty, traffic share, etc.

Locate the low-ranking keywords by applying a position filter that displays keywords where your website ranks in position 11 and beyond. 

applying "Position" filter to find keywords where a website ranks in position 11 and beyond

Consider optimizing any relevant keywords in this list to improve your ranking position and increase organic traffic.

Use Google Search Console

Google Search Console (GSC) is a free and powerful tool provided by Google that offers valuable insights into your website's performance in search results. 

One of its key features is the ability to see which organic keywords drive traffic to your site, including data for specific URLs.

To find organic keywords for specific URLs, log into your Google Search Console account and click “Search results” under “Performance.”

Google Search Console home with “Search results” under “Performance” clicked

This will take you to the “Performance on Search results” report that will look similar to this:

“Performance on Search results” report showing graphs with total clicks and total impressions over time

Scroll down to the section below for an overview of the organic keywords your website is getting clicks for.

"Top queries" report on Google Search Console showing a list of organic keywords with their respective clicks and impressions

Now, click on the "Pages" tab to view a list of your website's URLs.

"Top pages" report on Google Search Console showing a list of URLs with their respective clicks and impressions

Find the URL you're interested in and click on it. This will filter the “Performance on Search results” report to show data only for that specific page.

"URL" filter applied on “Performance on Search results” report showing clicks and impressions data for a specific page

Click on “Average CTR” and “Average position.” 

“Performance on Search results” report with the unchecked “Average CTR” and “Average position” boxes highlighted

Now, switch to the "Queries" tab. This will display the organic keywords that people used to find that particular URL in Google search results. 

You'll see metrics like impressions, clicks, click-through rate (CTR), and average position for each keyword.

"Top queries" report for a specific URL showing a list of keywords with their respective clicks, impressions, CTR and position

Analyze this data to identify which keywords drive the most traffic to that page. 

Now, start optimizing your website for these keywords.

How to Optimize Your Site for Organic Keywords

It’s time to optimize your website to increase your organic keywords And our guide to on-page SEO shows you how.

Here are some ideas to get you started:

  • Incorporate keywords in your content. Integrate your organic keywords naturally into your content. Avoid keyword stuffing.
  • Optimize title tags. Add your organic keywords in title tags.
  • Optimize URL structures. Include relevant organic keywords in URL slugs.
  • Optimize meta descriptions. Use your organic keywords in meta descriptions. Although meta descriptions don’t directly impact rankings, they influence click-through rates and can entice users to visit your site.
  • Optimize headings and subheadings. Incorporate keywords within headings and subheadings to signal the content's relevance to search engines.
  • Get the search intent right. Make sure your keyword’s search intent matches your content.

Monitor Your Organic Keyword Rankings

As you begin optimizing your site for organic keywords, you should also start seeing improvements in your rankings.

Use Semrush's Position Tracking tool to keep track of ranking for multiple keywords. And monitor the overall ranking performance of your website.

Start by setting up a project. Once complete, you’ll see important key performance indicators (KPIs), such as visibility, estimated traffic, and average position.

visibility, estimated traffic, and average position metrics shown on the Position Tracking tool

You’ll also see the keywords’ ranking distribution:

"Rankings distribution" report on "Position Changes" showing a graph with keywords by ranking position

And ranking data at the keyword level:

"Rankings Overview" report in the Position Tracking tool showing ranking data at a keyword level along with intent, volume, KD%, position changes, etc.

Use this tool to stay on top of your keywords’ performance. And make optimizations as needed.

You can also use the Organic Rankings tool to easily track and monitor position changes for organic keywords that your site ranks for—just like you would with a competitor’s keywords. 

Navigate to the “Position Changes” tab and review how your site maintains, improves, or loses organic rankings. The “Traffic Diff.” column in this widget is an especially helpful visual. 

the "Traffic Difference" column for "Declined keywords" on "All Position Changes highlighted

If you are losing rankings, you can prioritize optimizing your content by how badly your ranking is slipping for a given keyword.

Alternatively, for a high-level overview of your website's keyword rankings, you can try our free keyword rank checker.

Launch Your Organic Keyword Strategy

Understanding and leveraging organic keywords is fundamental to elevating your SEO game. 

Harness Semrush’s suite of tools—like the Keyword Magic Tool—to uncover key terms that will draw the right audience to your site. As you integrate these keywords into your content, keep an eye on quality and relevance to ensure that you meet your audience's needs and search intents.

Successful SEO isn’t just about finding the right keywords—it's about crafting content that resonates with your visitors and compels them to engage. 

So, begin your journey by exploring organic keywords. Then, use them to optimize your site and help make an impact on your organic traffic and visibility.

Get started with a free Semrush account today.

Share
Share